Plug and Abandon

Preparation of a well to be closed permanently, usually after either logs determine there is insufficient hydrocarbon potential to complete the well, or after production operations have drained the reservoir. Different regulatory bodies have their own requirements for plugging operations. Most require that cement plugs be placed and tested across any open hydrocarbon-bearing formations, across all casing shoes, across freshwater aquifers, and perhaps several other areas near the surface, including the top 20 to 50 ft [6 to 15 m] of the wellbore.

Home Operations Plug and Abandon

Connect with us

Our Customers

  • Nations Petroleum
  • ERG Resources
  • Santa Maria Pacific Energy
  • State of California
  • Southern California Gas Company

Contact us at

Rival Well Services

Address: 18812 Highway 65 Bakersfield, CA 93308

Mailing Address: P.O. Box 12620 Bakersfield, CA 93389

Email: info@rivalwellservices.com
Phone Number: (661) 392-1700